This project was completed by Mansour Keenan and Associates was in 2001. The project involved
a total rehabilitation of the existing steam plant and steam distribution system as well as adding 700 tons to the chilled water plant capacity. |
|
| The Montfort Hospital decided in 2002 to completely revamp the way they deliver emergency care. The emergency department was renovated to a more open concept design. Mansour Engineering was selected to provide total mechanical and electrical engineering services for this project. |
|
 |
The expansion of the Monfort Hospital, with a total budget of $230 million dollars, involved the addition of two new wings and a significant renovation of existing facilities – including intensive care, obstetrics, mental health, ambulatory care and emergency services. The redeveloped facility will have a capacity of 417 beds (289 for inpatient; 128 for long-term care) and will increase the size of the hospital to 750,000 square feet. An additional facility for treating members of the Canadian Forces, funded by the federal government, is also part of the expansion. Construction is under way and is scheduled for completion in 2009. Mansour Keenan and Associates are the mechanical and electrical engineers for the renovation portion of the project. |
|
   |
| This project with total budget of $23 million was carried out in phases from 1999 to 2003. This project involved the total replacement of the existing mechanical and electrical systems in the original 1953 hospital. Mansour-Keenan acted as the mechanical and electrical engineers on this project. |
 |
30 Metcalfe is located in downtown Ottawa. The existing 150 ton chiller located in the mechanical penthouse was nearing its useful lifetime. Mansour Engineering was commissioned by Minto Properties to replace the chiller with a modern chiller. |
 |
Mansour Engineering provided the mechanical and electrical engineering for this 9 story office building in downtown Ottawa. Our scope also involves the fit-up work for most of the building to house institutional clients such as PWC and Bell Canada. |
 |
This is a 40,000 sq. ft. office building. Mansour Engineering provided total mechanical and electrical services for this building. |
 |
Mansour Engineering provided all Mechanical and Electrical Design and construction supervision for this is 30,000 sq. ft. office building for the Canadian International Development Agency located in Gatineau, Quebec. |
 |
Mansour Engineering provided the mechanical and electrical engineering required for this 25,000 sq. ft. space to accommodate Clarica. |
|
  |
| Mansour Engineering was the Canadian mechanical and electrical engineering firm that worked on this 300 station call center in Ottawa. The systems employed included HVAC, plumbing, server room cooling, power distribution, lighting, fire alarm, as well as total stand-by power for the facility. |
 |
Mansour and Associates provided the engineering for this classic building housing the Egyptian Embassy. |
|
   |
| This $18 million state of the art United Arab Emirates Embassy is currently under construction in downtown Ottawa. Mansour Engineering is proud to provide the full mechanical, electrical and commissioning services for this project. |
 |
Mansour Engineering was commissioned to fit-up this 180,000 sq. ft. building to accommodate the Revenue Canada GST main distribution system. Due to tight scheduling, the project was fast-tracked and we had to complete the entire mechanical and electrical engineering at a rate of one complete floor per week including the mechanical sorting and distribution floors. |
|
   |
| This $8 million project is a landmark in front of the National Museum in Ottawa. Mansour Engineering is proud to have provided civil, mechanical and electrical engineering services for this project. One of the particular challenges was how to hide the mechanical equipments in this low lying building. |
 |
Mansour Engineering was approached to solve the problem of insufficient fire flow for the 22 story National Defense Headquarters in downtown Ottawa. The solution that was presented and implemented was to install new 1500 gallon fire pumps as well as to convert the fire fighting system to high and low zones that will provide for the fire flow while protecting the existing piping from extreme stress. |
|
   |
| This 16 story high rise is one of the first vertical multi-use buildings to be built in Edmonton. The building is comprised of 13,000 sq. ft. of retail space, 116,000 sq. ft. of office space, a 6000 sq. ft. fitness center, and a 4000 sq. ft. conference center. In addition, the top 6 levels are high-end residential condominiums. The building is also served by 3 levels of underground parking. Mansour and Associates is proud to serve as the civil and mechanical engineering consulting firm for this project. |
|
   |
| Centre Jules-Léger in Ottawa provides education for students who are blind, visually impaired, or deaf-blind. The M/E systems were required to accommodate the student’s conditions. Mansour Engineering is especially proud to have provided the mechanical and electrical engineering for this school. |
|
   |
| This is a two story elementary school in Ottawa, and included a full gymnasium. Mansour Engineering provided the total mechanical and electrical engineering for this project. |
|
- Rockland Public School
- Our Lady of Good Council School
- Plantagenet Public School
- Vankleek Hill Public School
- School conversion for Glen Ogilvie, Dunning Foubert, Carson Grove, Greely and Queenswood
- Vankleek Hill High School
- Russell Public School
- La Ronge School
- Christ the King School, Whitehorse
- Ermineskin School, Edmonton
- St. Benedict School, Edmonton
- St. Phillip School, Edmonton
- Weinlos School, Edmonton
- St. Theresa School, Edmonton
- Frère Antoine School, Edmonton
- Hillcrest School, Edmonton
|
 |
The 1.5 MW plant handles the entire DFL and storage building #87 Backup Diesel generator: Mansour Engineering provided total project engineering and project management for this facility. |
 |
Building 91A
Building 141
Building 158 -R & D
Building 158 -Room 119
Building 201
Building 282A
Building 191A |
Building 202B
Dow Building 211
Dow Building 248A
MCC Room for EIG (Bldg)
Dow Building 214A
Dow Boiler Room
Dow Building 248B
Dow Standard |
|
   |
Location: Halifax NS & Esquimalt, BC, January 2000 ($14 million each)
The building is designed to provide year round training capabilities in live propane fueled fire fighting, flood control and nuclear, biological and chemical (NBC) safety and containment. The facility has 15 live fire training rooms. The trainers are exposed to realistic fire and smoke, light and heat and are taught in proper fire safety and suppression techniques. NBC training deck is built to simulate the deck of a frigate at sea. Flood control training takes place in two separate floodable rooms with operator controlled pressurized tanks. Flood rooms are constructed on a 15 degree list to give trainers the experience of simulated hull breaches.
Mansour and Associates were responsible for the conceptual design of the Fire Props and control systems as well as the mechanical systems for both facilities. These projects, built simultaneously in both Halifax and Esquimalt, are state of the art fire fighter and damage control training facilities designed to meet the safety training requirements for the Canadian Navy in response to the renewed naval fleet of frigates and MCDV's as well as acquisition of the Victoria class of submarines. |
|
   |
| We are proud to have been associated with OC Transpo for many years. Mansour and Associates have provided civil, mechanical and electrical engineering services for many projects including the construction of the 300 bus North Garage, new services and tire bays at the Merivale garage to the new body shop service area at the St. Laurent garage. |
 |
Located in Wetaskiwin Alberta, this facility was built for Canada Packers in the early 1980s. Mansour and Associates were the civil and mechanical consultants for the facility. |
|
- Syncrude P.S.A. Building - Fort McMurray, Alta.
- Condensate Treatment- Fort McMurray, Alta.
- ESSO Oil Hazard Material Warehouse ** - Edmonton, Alta.
- Syncrude Heavy Equipment Garage - Mildred Lake, Alta.
- Suncor Steam Building - Fort McMurray, Alta.
- Suncor Cat Shop- Fort McMurray, Alta.
- Suncor Inc. - Instrumentation Upgrading- Fort McMurray, Alta.
- Syncrude Analyzer/Multiplexer Buildings- Fort McMurray, Alta.
- Alberta Gas Ethylene Sub Station ** - Joffre, Alta.
- Alberta Gas Ethylene Control Bldg. **- Joffre, Alta.
- Shell Additives Building **- Scotford Refinery, Alta.
- Shell Inhibitor Building **- Styrene Plant, Alta.
- Shell Process Substation ** -Styrene Plant Alta.
- Shell Vent Gas Compressor Building **- Scotford, Alta.
- Goodfish Indian Band Dry Cleaning Plant - Goodfish, Alta.
- Leduc Food Processing Centre- Leduc, Alta.
- Ostrem Chemicals- Edmonton, Alta.
- Midland Glass- Edmonton, Alta.
- Cardinal River coals Mine -Hinton, Alta.
- Suncor Inc.-Ore bin enclosure- Fort McMurray, Alta.
- Canadian PVC Plant Reaction Bldg - Edmonton, Alta
- Husky Oil Refinery Bldg. Edmonton, Alta.
- Sulmar Melting Plant * - Fort McMurray, Alta.
- Titan Foundry * - Edmonton, Alta.
* Include High Temperature Ventilation.
** Classified as High Hazard Buildings.
*** Most Dow Chemical Projects in FT. Saskatchewan, Alta, were located in an environment classified as either explosive or highly corrosive |
 |
This facility provides health services support to 2 Canadian Mechanized Brigade Group (2 CMBG). The new multi-use facility is about 8,000 square meters in size. It includes areas for administration, training, storage, vehicles and vehicle maintenance. Mansour Engineering served as DND’s advocate for the civil, mechanical and electrical systems including the performance specifications, data sheets, statement of requirements, tendering, and selection of contractor, inspection and commissioning. |
 |
This two-storey building is connected to the existing Canadian Medical Equipment Depot (CMED). The facility is used for the logistical planning of operations, training, warehousing and storage of the material as well as equipment required for the quick deployment of field hospitals around the world. It also accommodates offices, training facilities, maintenance garages, docking and warehousing facilities, and a vehicle storage compound. Mansour Engineering served as DND’s advocate for the civil, mechanical and electrical systems including the performance specifications, data sheets, statement of requirements, tendering, and selection of contractor, inspection and commissioning. |
 |
Mansour Engineering together with GRC and Westeinde Construction completed this project in 1998. The project included total renovation of hangers 7 and 8 complete with new link. The facility is used for the logistical planning of operations, training, warehousing and storage of the material as well as equipment required for the relocated Canadian forces parachute center. Mansour Engineering provided all mechanical and electrical engineering for this project including commissioning services. |
|
   |
| The Sawridge Inn and Conference Centre Jasper is a four star full service resort hotel offering the finest in Canadian Rockies conference facilities and accommodations, boasting 153 air-conditioned rooms and suites. The property is designed around a 3-storey fireplace, a sky lit atrium of greenery and indoor pool. The hotel banquet facilities cater to groups as large as 250 people. The hotel has 4 different restaurants supported by a full kitchen. Mansour and Associates is proud to have provided full civil and mechanical engineering services for this project. |
|
   |
| This apartment-style hotel has 117 rooms and 9 floors. The creative concept for the Bostonian Executive Suites Hotel involved transforming an established apartment building located in an historic Ottawa neighborhood into a 4 star hotel. Mansour Engineering provided full mechanical and electrical engineering services. |
|
   |
| The Printing Bureau is located in Hull, Quebec. With over one million sq. ft., it was once the largest building in the Ottawa area. Mansour Engineering was commissioned by Public Works and Government Services Canada (PWGSC) to investigate the original domestic water piping and heating system in the building and make recommendations for its remedy. We are proud that all our recommendations were accepted and implemented. |
 |
The study focused on the strategic (versus operational) evaluation of the PWGSC CHCP system in the National Capital Area. The study objectively assessed ownership and operational scenarios, recognizing the range of issues and opportunities affecting CHCP portfolio management, including those scenarios that might give rise to potential for involvement by, or partnerships with, third parties. Mansour Engineering served as the project manager as well as the government advocate for this major study. |
|
  
   |
| Mansour Engineering has provided mechanical and electrical asset management plans for numerous facilities. The studies include such prominent buildings such as the National Archives, East and West Memorial buildings, St. Andrew’s Towers, Louis St. Laurent building, Jean Talon building and the OC Transpo administration building. |
|
 |
| Roger-Guindon Hall is the home of the Faculty of Medicine and the Faculty of Health Sciences of the University of Ottawa. This bio-containment level 3 laboratory was completed in 1992. The building is a major center for neuromuscular disease research. The building contains multiple laboratories, offices, administration, animal holding & care facilities and other support areas. Mansour and Associates provided full mechanical and electrical engineering for this facility. |
 |
This facility was fast-tracked and completed in 1999. The facility houses confidential research carried out by Nortel. Mansour and Associates provided and carried out full mechanical and electrical engineering services for this facility. |
|
  |
| One of our most prestigious addresses in the City of Edmonton, the David Thompson is a beautiful building offering executive living and some of the most spectacular views available in the city. The building is a 17 story high rise, with 2 levels of commercial space as well as 3 levels of underground parking. There are also 132 large one and two bedroom apartments. The amenities: lounge, Jacuzzi, sauna and exercise room. Mansour and Associates provided the full civil, and mechanical engineering for this project. |
 |
Sturgeon Point Villas –$18.5 million, 280-unit, four-storey, wood frame walkup building in St. Albert (Edmonton), Alberta built in 1978. The project is situated on a 9.5 acre property along the Sturgeon River and consists of 68 one-bedroom, 60 two bedroom, 38 two bedroom plus den, and 114 three bedroom residential units. The project has a total rentable square footage of 284,953 sq. ft. Mansour and Associates provided the full civil, and mechanical engineering services for this project. |
|